Live Factory Tour Update
Right now at Gold Star PVC Plant:
🔧 27,842 sheets produced today
🔍 0 defects detected
🚚 Next shipment leaves in 2h15m

The 27-Step Quality Journey
Stage 1: Raw Material Inspection (Steps 1-5)
- Blockchain Verification - Scans recycled PVC pellets' origin (Live: 92% recycled content)
- X-Ray Fluorescence - Detects heavy metals (Rejected 3 batches at 9:15 AM)
- Moisture Analyzer - Ensures <0.1% water content
- Color Spectrometry - Matches Pantone codes within ΔE<0.5
- VOC Sniffer - Confirms 0 formaldehyde emission
October 11 Upgrade: New AI system reduces testing time by 40%
Stage 2: Production Monitoring (Steps 6-15)
- Extrusion Temp | Infrared Sensors | ±1°C |
- Thickness | Laser Micrometers | ±0.03mm |
- Surface Texture | 8K Camera Array | 99.9% match |
- Core Density | Ultrasonic Scanner | 0.72±0.01g/cm³ |
- Cooling Rate | Thermal Imaging | 2.5°C/min |
Live Alert (10:45 AM): Auto-rejected 12 sheets for microscopic bubbles
Stage 3: Final Inspection (Steps 16-27)
16-20: Physical Tests
- Scratch Resistance (50,000 steel wool cycles)
- Impact Test (5kg steel ball from 1m)
- Water Immersion (72hr weight change <0.05%)
21-27: Smart Verification
- QR Code Tracing - Links to all test data
- AI Visual Scan - Detects 0.01mm² flaws
- Bending Robot - Simulates 10 years of stress
Saturday Special: Scan any panel's QR to see its birth certificate
Why 27 Steps Matter?
Compared to Traditional Materials:
| Check Type | PVC Sheet | Drywall | Ceramic Tile |
|---|
| Pre-Production | 5 | 1 | 2 |
| In-Process | 10 | 3 | 4 |
| Final | 12 | 2 | 5 |
October 11 Incident: A competitor's tile factory had 23% defect rate this morning